Failure Event - US, OR, Powin - 11 Apr 2019
Jump to navigation
Jump to search
Overview
| Event Details | |
|---|---|
| Location: | US, OR, Powin |
| Setting: | New product testing |
| Capacity (MWh): | |
| Capacity (MW): | |
| Battery Module: | |
| Operator / Integrator: | Powin HQ |
| Application: | |
| Installation: | |
| Enclosure Type: | |
| Event Date: | 11 April 2019 |
| System Age (yr): | |
| Extent of Damage: | |
| State During Accident: | |
| Description: | |
| Source: | The Oregonian |
| Additional Resources: | |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.