Template:Decommissioning RACI Nav Table

From EPRI Storage Wiki
Jump to navigation Jump to search

This is the "Decommissioning RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.

To use this, place

{{Decommissioning RACI Nav Table}}

in the desired location on a page.

Template preview

Chapter 6: Decommissioning - Outline and RACI Matrix Project Mgmt. Engineering Safety Operations Legal IT / OT Cybersecurity Land / Environment Corporate Sustainability Site Manager
Plan for Decommissioning
Determine roles and scope for decommissioning A/R C C C I I I I R/C
Develop decommissioning plan A R C C I I C C R/C
Determine material value and cost of decommissioning at EOL A/R R/C I I I I C C C
Maintain documentation for decommissioning A/R C C C C I I I A/R
Onsite preparations A C C C C I I I R
Disconnect and Decommission
Determine end of life condition has been met A C C R I I C C R
Execute decommissioning plan A C C I I I I I R
Transport to End Destination
Package for transport A C C I I I I I R
Transportation to next destination A/R I I I C/I I C/I I I
Additional Resources