Difference between revisions of "Template:Decommissioning RACI Nav Table"
Jump to navigation
Jump to search
EulaBillaut (talk | contribs) |
EulaBillaut (talk | contribs) |
||
| Line 124: | Line 124: | ||
| style="text-align: center;" | I | | style="text-align: center;" | I | ||
|- | |- | ||
| colspan = "10" | [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Operations_and_Maintenance_Resources|Additional Resources]] | |||
|} | |} | ||
Revision as of 13:58, 9 November 2023
This is the "Decommissioning RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.
To use this, place
{{Decommissioning RACI Nav Table}}in the desired location on a page.
Template preview
| Chapter 6: Decommissioning - Outline and RACI Matrix | Project Mgmt. | Engineering | Safety | Operations | Legal | IT / OT Cybersecurity | Environmental Compliance | Corporate Sustainability | Site Manager |
|---|---|---|---|---|---|---|---|---|---|
| Plan for Decommissioning | |||||||||
| Determine roles and scope for decommissioning | A/R | C | C | C | I | I | I | I | R/C |
| Develop decommissioning plan | A | R | C | C | I | I | C | C | R/C |
| Determine material value and cost of decommissioning at EOL | A/R | R/C | I | I | I | I | C | C | C |
| Maintain documentation for decommissioning | A/R | C | C | C | C | I | I | I | A/R |
| Onsite preparations | A | C | C | C | C | I | I | I | R |
| Disconnect and Decommission | |||||||||
| Determine end of life condition has been met | A | C | C | R | I | I | C | C | R |
| Execute decommissioning plan | A | C | C | I | I | I | I | I | R |
| Transport to End Destination | |||||||||
| Package for transport | A | C | C | I | I | I | I | I | R |
| Transportation to next destination | A/R | I | I | I | C/I | I | C/I | I | I |
| Additional Resources | |||||||||