Difference between revisions of "Template:Decommissioning RACI Nav Table"

From EPRI Storage Wiki
Jump to navigation Jump to search
 
(5 intermediate revisions by one other user not shown)
Line 4: Line 4:
To use this, place <pre>{{Decommissioning RACI Nav Table}}</pre> in the desired location on a page.
To use this, place <pre>{{Decommissioning RACI Nav Table}}</pre> in the desired location on a page.
== Template preview ==
== Template preview ==
</noinclude>
</noinclude>{| class="wikitable"
 
{| class="wikitable"
|+
|+
! Chapter 6: Decommissioning - Outline and RACI Matrix
! Chapter 6: Decommissioning - Outline and RACI Matrix
Line 15: Line 13:
! Legal
! Legal
! IT / OT Cybersecurity
! IT / OT Cybersecurity
! Environmental Compliance
! Land / Environment
! Corporate Sustainability
! Corporate Sustainability
! Site Manager
! Site Manager
Line 124: Line 122:
| style="text-align: center;" | I
| style="text-align: center;" | I
|-
|-
| colspan="10" | [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Operations_and_Maintenance_Resources|'''Additional Decommissioning Resources''']]
| colspan = "10" | [[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance#Operations_and_Maintenance_Resources|'''Additional Resources''']]
 
|}
|}

Latest revision as of 13:51, 20 December 2024

This is the "Decommissioning RACI Nav Table" template used to quickly and concisely add this RACI Nav Table to a page.

To use this, place

{{Decommissioning RACI Nav Table}}

in the desired location on a page.

Template preview

Chapter 6: Decommissioning - Outline and RACI Matrix Project Mgmt. Engineering Safety Operations Legal IT / OT Cybersecurity Land / Environment Corporate Sustainability Site Manager
Plan for Decommissioning
Determine roles and scope for decommissioning A/R C C C I I I I R/C
Develop decommissioning plan A R C C I I C C R/C
Determine material value and cost of decommissioning at EOL A/R R/C I I I I C C C
Maintain documentation for decommissioning A/R C C C C I I I A/R
Onsite preparations A C C C C I I I R
Disconnect and Decommission
Determine end of life condition has been met A C C R I I C C R
Execute decommissioning plan A C C I I I I I R
Transport to End Destination
Package for transport A C C I I I I I R
Transportation to next destination A/R I I I C/I I C/I I I
Additional Resources