Difference between revisions of "Utility BESS Handbook"

From EPRI Storage Wiki
Jump to navigation Jump to search
Line 1: Line 1:
{{DISPLAYTITLE:Utility Battery Energy Storage System (BESS) Handbook}}
{{DISPLAYTITLE:Utility Battery Energy Storage System (BESS) Handbook}}
{{BESS Handbook User Navigation}}
{{BESS Handbook User Navigation}}
__NOTOC__


= A Handbook for Utility Project Managers and Engineers Involved in the Life Cycle of BESS Projects =
= A Handbook for Utility Project Managers and Engineers Involved in the Life Cycle of BESS Projects =
{| class="wikitable"
! Contents
! Access
|-
|[[Utility_BESS_Handbook/Handbook_Introduction|Chapter 1: Handbook Introduction and RACI Tables]]
| rowspan="6" | P94C or P94D only
|-
|[[Utility_BESS_Handbook/Handbook_Planning|Chapter 2: Planning of Energy Storage]]
|-
|[[Utility_BESS_Handbook/Handbook_Procurement|Chapter 3: Procurement of Energy Storage]]
|-
|[[Utility_BESS_Handbook/Handbook_Deployment_and_Integration|Chapter 4: Deployment and Integration of Energy Storage]]
|-
|[[Utility_BESS_Handbook/Handbook_Operations_and_Maintenance|Chapter 5: Battery Energy Storage Project Operations and Maintenance]]
|-
|[[Utility_BESS_Handbook/Handbook_Decommissioning|Chapter 6: Decommissioning and End-of-Life Management of Energy Storage]]
|}


= Primary Audience =
= Primary Audience =
Line 23: Line 41:
* Potential pitfalls, lessons learned, and “unknown unknowns” in the BESS planning and procurement process, where utilities will have to manage risks in a relatively immature product environment.
* Potential pitfalls, lessons learned, and “unknown unknowns” in the BESS planning and procurement process, where utilities will have to manage risks in a relatively immature product environment.
* Additional, detailed resources on specific topics in this handbook that can be accessed via annotated and digitally linked references.
* Additional, detailed resources on specific topics in this handbook that can be accessed via annotated and digitally linked references.
= Navigable RACI Tables =
The following tables serve as both a reference RACI table resource as well as a navigation tool to help users to jump to the most relevant sections of the handbook content.
== Chapter 2: Planning of Energy Storage ==
{{Planning RACI Nav Table}}
== Chapter 3: Procurement of Energy Storage ==
{{Procurement RACI Nav Table}}
== Chapter 4: Deployment and Integration of Energy Storage ==
{{Deployment RACI Nav Table}}
== Chapter 5: Battery Energy Storage Project Operations and Maintenance ==
{{O&M RACI Nav Table}}
== Chapter 6: Decommissioning and End-of-Life Management of Energy Storage ==
{{Decommissioning RACI Nav Table}}

Revision as of 13:14, 13 December 2023


BESS Handbook Index
Home Page
1. Introduction and RACI Tables
2. Planning
3. Procurement
4. Deployment and Integration
5. O&M
6. Decommissioning and EoL


A Handbook for Utility Project Managers and Engineers Involved in the Life Cycle of BESS Projects

Contents Access
Chapter 1: Handbook Introduction and RACI Tables P94C or P94D only
Chapter 2: Planning of Energy Storage
Chapter 3: Procurement of Energy Storage
Chapter 4: Deployment and Integration of Energy Storage
Chapter 5: Battery Energy Storage Project Operations and Maintenance
Chapter 6: Decommissioning and End-of-Life Management of Energy Storage

Primary Audience

Utility project managers and teams developing, planning, or considering battery energy storage system (BESS) projects.

Secondary Audience

Subject matter experts or technical project staff seeking leading practices and practical guidance based on field experience with BESS projects.

Key Research Question

As the demand for BESS projects expands across electric utilities, sharing of leading practices and lessons learned gleaned from past experience has become essential to adequately addressing safety issues, mitigating project and technical risks, and managing the cost of deployment and operation.

Research Overview

This report summarizes over a decade of experience with energy storage deployment and operation into a single high-level resource to aid project team members, including technical staff, in determining leading practices for procuring and deploying BESSs. The detailed information, reports, and templates described in this document can be used as project guidance to facilitate all phases of a BESS project to improve safety, mitigate risks, and manage costs.

As part of this goal, this report explores the necessary interaction between stakeholders within a utility throughout the life cycle of a BESS project and provides a high-level project narrative to coordinate efforts in a utility BESS project team. A focal point of stakeholder discussion for each project phase is a Responsibility Assignment (RACI) matrix, which organizes tasks chronologically and describes the involvement levels and roles for utility project teams.

This handbook details:

  • The life-cycle process for a successful utility BESS project, describing all phases including use case development, siting and permitting, technical specification, procurement process, factory acceptance testing, on-site commissioning and testing, operations and maintenance, contingency planning, decommissioning, removal, and responsible disposal.
  • Roles, responsibilities, and coordination between various utility departments for each phase of a BESS project.
  • Potential pitfalls, lessons learned, and “unknown unknowns” in the BESS planning and procurement process, where utilities will have to manage risks in a relatively immature product environment.
  • Additional, detailed resources on specific topics in this handbook that can be accessed via annotated and digitally linked references.