Difference between revisions of "Failure Event - South Korea, Jeju - 14 Sep 2018"

From EPRI Storage Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 50: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->
Line 60: Line 60:
  |Has Integrator=
  |Has Integrator=
  |Has Application=Solar Integration
  |Has Application=Solar Integration
  |Has Installation=Commerce Area
  |Has Installation=
  |Has Enclosure Type=Concrete
  |Has Enclosure Type=Concrete
  |Has Event Date=09/14/2018
  |Has Event Date=09/14/2018

Latest revision as of 15:09, 20 September 2022

Overview

Event DetailsSMW-Info-button.png
Location: South Korea, Jeju
Capacity (MW):
Capacity (MWh): 0.2
Battery Module:
Integrator:
Application: Solar Integration
Installation:
Enclosure Type: Concrete
Event Date: 14 September 2018
System Age (yr): 4
Extent of Damage:
State During Accident: Charging
Description:
Source: MOTIE Investigation, June 2019
Additional Resources:
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.