Difference between revisions of "Failure Event - South Korea, Jeju - 14 Sep 2018"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 50: | Line 50: | ||
:''Note: Missing values in this table reflect unknowns.'' | :''Note: Missing values in this table reflect unknowns.'' | ||
If you have any details or corrections you would like to contribute to the database please reach out to [mailto: | If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email]. | ||
<!--Set Semantic information for this system--> | <!--Set Semantic information for this system--> | ||
Line 60: | Line 60: | ||
|Has Integrator= | |Has Integrator= | ||
|Has Application=Solar Integration | |Has Application=Solar Integration | ||
|Has Installation= | |Has Installation= | ||
|Has Enclosure Type=Concrete | |Has Enclosure Type=Concrete | ||
|Has Event Date=09/14/2018 | |Has Event Date=09/14/2018 |
Latest revision as of 15:09, 20 September 2022
Overview
Event Details | |
---|---|
Location: | South Korea, Jeju |
Capacity (MW): | |
Capacity (MWh): | 0.2 |
Battery Module: | |
Integrator: | |
Application: | Solar Integration |
Installation: | |
Enclosure Type: | Concrete |
Event Date: | 14 September 2018 |
System Age (yr): | 4 |
Extent of Damage: | |
State During Accident: | Charging |
Description: | |
Source: | MOTIE Investigation, June 2019 |
Additional Resources: |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.