Difference between revisions of "Failure Event - South Korea, South Chungcheong, Cheonan - 12 Nov 2018"
Jump to navigation
Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...") |
(No difference)
|
Revision as of 12:36, 8 July 2021
Overview
Event Details | |
---|---|
Location: | South Korea, South Chungcheong, Cheonan |
Capacity (MW): | |
Capacity (MWh): | 1.2 |
Battery Module: | |
Integrator: | |
Application: | Solar Integration |
Installation: | Mountains |
Enclosure Type: | Prefab |
Event Date: | 12 November 2018 |
System Age (yr): | 0.9 |
Extent of Damage: | |
State During Accident: | Charged, inactive |
Source: | MOTIE Investigation, June 2019 |
Additional Resources: |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.