Difference between revisions of "Failure Event - UK, Liverpool - 15 Sep 2020"

From EPRI Storage Wiki
Jump to navigation Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...")
 
 
(3 intermediate revisions by the same user not shown)
Line 38: Line 38:
! State During Accident:
! State During Accident:
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
| {{#show: {{FULLPAGENAME}} |?Has State During Accident}}
|-
! Description:
| {{#show: {{FULLPAGENAME}} |?Has Event Description}}
|-
|-
! Source:
! Source:
Line 47: Line 50:
:''Note: Missing values in this table reflect unknowns.''
:''Note: Missing values in this table reflect unknowns.''


If you have any details or corrections you would like to contribute to the database please reach out to [mailto:dlong@epri.com Dirk Long].
If you have any details or corrections you would like to contribute to the database please reach out to our [mailto:Storage-Safety@epri.com Storage Safety email].


<!--Set Semantic information for this system-->
<!--Set Semantic information for this system-->
Line 54: Line 57:
  |Has Capacity (MWh)=10.0
  |Has Capacity (MWh)=10.0
  |Has Capacity (MW)=20.0
  |Has Capacity (MW)=20.0
  |Has battery vendor=LG Chem [NMC]
  |Has battery vendor=
  |Has Integrator=NEC
  |Has Integrator=Orsted
  |Has Application=Frequency Regulation
  |Has Application=Frequency Regulation
  |Has Installation=Substation
  |Has Installation=
  |Has Enclosure Type=Container
  |Has Enclosure Type=Container
  |Has Event Date=09/15/2020
  |Has Event Date=09/15/2020
Line 63: Line 66:
  |Has Extent of Damage=Explosion
  |Has Extent of Damage=Explosion
  |Has State During Accident=
  |Has State During Accident=
  |Has Source=[https://www.energy-storage.news/news/fire-at-20mw-uk-battery-storage-plant-in-liverpool Energy Storage News]
|Has Event Description=An explosion occurred before emergency responders were notified. The fire department arrived and contained the fire, which was limited to one out of the three containers, and confirmed end of incident two days later.
  |Has Additional Resources=[https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete https://orsted.com/en/media/newsroom/news/2019/01/orsteds-first-standalone-battery-storage-project-now-complete ]
  |Has Source=[https://epri.box.com/s/ro9v9uyekoen9638b9e5etppd97rq113 Investigation Report]
  |Has Additional Resources=[https://epri.box.com/shared/static/23frl7k4oo3kjm1gks83qbz9aoh6b5bl.pdf Energy Storage News]
  |Has Failure Event Category=ESS
  |Has Failure Event Category=ESS
}}
}}


[[Category:Failure Event]]
[[Category:Failure Event]]

Latest revision as of 12:38, 10 April 2024

Overview

Event DetailsSMW-Info-button.png
Location: UK, Liverpool
Capacity (MW): 20
Capacity (MWh): 10
Battery Module:
Integrator: Orsted
Application: Frequency Regulation
Installation:
Enclosure Type: Container
Event Date: 15 September 2020
System Age (yr): 1.5
Extent of Damage: Explosion
State During Accident:
Description: An explosion occurred before emergency responders were notified. The fire department arrived and contained the fire, which was limited to one out of the three containers, and confirmed end of incident two days later.
Source: Investigation Report
Additional Resources: Energy Storage News
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.