Failure Event - US, CA, Moss Landing - 20 Sep 2022

From EPRI Storage Wiki
Revision as of 20:22, 16 May 2024 by Jthompson (talk | contribs)
Jump to navigation Jump to search

Overview

Event DetailsSMW-Info-button.png
Location: US, CA, Moss Landing
Capacity (MW): 182.5
Capacity (MWh): 730
Battery Module: Tesla
Integrator: Tesla
Application: Energy Shifting, Ancillary Services
Installation: Substation
Enclosure Type: Container
Event Date: 20 September 2022
System Age (yr): 0.5
Extent of Damage:
State During Accident: Operational
Description: Fire in one Megapack unit at PG&E Elkhorn battery facility
Root Cause: Integration, Construction, or Assembly

Design

Failed Element: Balance of plant

Controls

Source: KSBW News
Additional Resources: InsideEVs
Teslarati
PG&E
Note: Missing values in this table reflect unknowns.

If you have any details or corrections you would like to contribute to the database please reach out to our Storage Safety email.