Load Shed
< DER VET User Guide | Inputs
Jump to navigation
Jump to search
Revision as of 14:12, 31 March 2021 by en>MilesEvans (Created page with "{{DISPLAYTITLE: {{SUBPAGENAME}}}} This file describes the load shed schedule that will be assumed in reliability calculations when the input DER_VET_User_Guide/Services/Rel...")
This file describes the load shed schedule that will be assumed in reliability calculations when the input load_shed_percentage is turned on.
- Outage Length (hrs) - This is the upper limit of outage duration in hours that the specified load shed conditions will be maintained for.
- Load Shed (%) - What percentage of the critical load will be maintained at this outage duration. 100% indicates that the full critical load will be supplied. 25% indicates that three quarters of the critical load will be shed.