Difference between revisions of "Failure Event - Australia, Victoria, Geelong - 30 Jul 2021"
Jump to navigation
Jump to search
Line 64: | Line 64: | ||
|Has State During Accident=Construction, Commissioning | |Has State During Accident=Construction, Commissioning | ||
|Has Source=[https://www.abc.net.au/news/2021-07-30/tesla-battery-fire-moorabool-geelong/100337488 ABC News] | |Has Source=[https://www.abc.net.au/news/2021-07-30/tesla-battery-fire-moorabool-geelong/100337488 ABC News] | ||
|Has Additional Resources= | |Has Additional Resources=[https://electrek.co/2021/07/30/tesla-megapack-caught-fire-giant-battery-project-australia/ Electrek]<br>[https://reneweconomy.com.au/australias-biggest-battery-registered-but-battery-storage-supply-crunch-looms/ Renew Economy]<br>[https://news.cfa.vic.gov.au/firefighters-bring-large-battery-fire-near-geelong-under-control Country Fire Authority]<br>[https://www.epa.vic.gov.au/about-epa/news-media-and-updates/news-and-updates/epa-deploys-air-monitors-to-moorabool-fire EPA Victoria] | ||
|Has Failure Event Category=ESS | |Has Failure Event Category=ESS | ||
}} | }} | ||
[[Category:Failure Event]] | [[Category:Failure Event]] |
Revision as of 11:37, 20 August 2021
Overview
Event Details | |
---|---|
Location: | Australia, Victoria, Geelong |
Capacity (MW): | 300 |
Capacity (MWh): | 450 |
Battery Module: | Tesla |
Integrator: | Tesla |
Application: | Grid Stability |
Installation: | Rural |
Enclosure Type: | Integrated products |
Event Date: | 30 July 2021 |
System Age (yr): | 0 |
Extent of Damage: | Fires in two Megapacks |
State During Accident: | Construction, Commissioning |
Source: | ABC News |
Additional Resources: | Energy Safe Victoria - Statement of Technical Findings Electrek Renew Economy Country Fire Authority EPA Victoria |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.