Difference between revisions of "Failure Event - China, Hunan - 7 Jan 2021"
Jump to navigation
Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...") |
(No difference)
|
Revision as of 12:36, 8 July 2021
Overview
Event Details | |
---|---|
Location: | China, Hunan |
Setting: | Recycling |
Capacity (MWh): | |
Capacity (MW): | |
Battery Module: | |
Operator / Integrator: | CATL, Brunp Recycling |
Application: | |
Installation: | |
Enclosure Type: | |
Event Date: | 7 January 2021 |
System Age (yr): | |
Extent of Damage: | explosion, 1 dead, 19 injured |
State During Accident: | |
Source: | ESP |
Additional Resources: |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.