Difference between revisions of "Failure Event - US, CA, Moss Landing - 13 Feb 2022"
Jump to navigation
Jump to search
(Created page with "=Overview= {| class="wikitable" style="width: 50%; font-size: 90%; border: 1px solid #aaaaaa; background-color: #f9f9f9; color: black; margin-bottom: 0.5em; margin-left: 1em;...") |
|||
Line 64: | Line 64: | ||
|Has State During Accident=Operational | |Has State During Accident=Operational | ||
|Has Source=[https://www.ksbw.com/article/second-battery-malfunction-in-less-than-6-months-reported-at-moss-landing-power-plant/39083568 KSBW News] | |Has Source=[https://www.ksbw.com/article/second-battery-malfunction-in-less-than-6-months-reported-at-moss-landing-power-plant/39083568 KSBW News] | ||
|Has Additional Resources= | |Has Additional Resources=[https://investor.vistracorp.com/news?item=220 Vistra Corp] | ||
|Has Failure Event Category=ESS | |Has Failure Event Category=ESS | ||
}} | }} | ||
[[Category:Failure Event]] | [[Category:Failure Event]] |
Revision as of 14:31, 15 February 2022
Overview
Event Details | |
---|---|
Location: | US, CA, Moss Landing |
Capacity (MW): | 100 |
Capacity (MWh): | 400 |
Battery Module: | LG Energy Solution |
Integrator: | |
Application: | Solar Integration |
Installation: | Power Plant |
Enclosure Type: | Building |
Event Date: | 13 February 2022 |
System Age (yr): | 1 |
Extent of Damage: | Burnt racks |
State During Accident: | Operational |
Source: | KSBW News |
Additional Resources: | Vistra Corp |
- Note: Missing values in this table reflect unknowns.
If you have any details or corrections you would like to contribute to the database please reach out to Dirk Long.